Sandip's Energy Audit Project
Home
Light Audit
Pump Audit
HVAC
Contact Us
Pump Audit
Pre Audit Detials
Pump Application
BFP
Muncipal Water
Agricultural Pumping
AHU System
Other
Fluid to be pumped
Water
Air
Oil
Sewage
Waste Water
Other
Fluid Density
Kg/m
3
Suction Head (hs)
m
Discharge Head(hd)
m
Pump Flowrate/Capacity (Q)
m
3
/hr
Motor Voltage (V)
V
Motor Current (I)
A
Motor Rpm (N1)
RPM
Rated Efficiency of Motor
%
Motor Power
kW
Running Time
hrs/day
Working Days/Month
days
Pipe Diameter (D)
m
Length (L)
m
Tarriff
Rs.
Submit
Calculated Results
Energy Consumption and Bill
Monthly Energy Consumption
Units
Monthly Bill
Rs.
Yearly Energy Consumption
Units
Yearly Bill
Rs.
Overall Efficiency
%
Power Factor
Total Head (m)
Efficiency (%)
Power Factor
Power Consumption (kWh)
Bill (Rs.)
Recommendation Table
Symptom
Throttle valve controlled system
Bypass line exists
Constant pump operation
High Maintenance cost
Throttling
Hard Start Capability
Bearing Life, Improve in operating Efficiency, Reduce Cost
Varying Flow control
Likely Reason
Best Solution
Calculation
Application
Calculation
© 2024 Copyright: Sandip Poudel